Underground Parking Structure

Owner

Confidential Client

Area

120,000 SF

Completion Date

2018

This underground parking structure, is a 120,000 square foot precast concrete parking structure built in the 1980’s. The structure consists of a single level of precast concrete double tees supported by a concrete foundation wall along the perimeter and precast inverted tee beams and columns at the interior. The precast structure supports both vehicular traffic/parking and a landscaped plaza deck area.

ZS was retained to prepare rehabilitation and structural improvement construction documents.

The project scope includes:

  • A thorough survey of the structural conditions, including a hands-on examination of all structural components.
  • Waterproofing investigation and design.
  • Laser scanning and BIM conversion.
  • New topping slab with hydronic snow melt system.
  • Concrete surface repairs and stair replacement.
  • Construction administration services during construction.

 

 

This underground parking structure, is a 120,000 square foot precast concrete parking structure built in the 1980’s. The structure consists of a single level of precast concrete double tees supported by a concrete foundation wall along the perimeter and precast inverted tee beams and columns at the interior. The precast structure supports both vehicular traffic/parking and a landscaped plaza deck area.

ZS was retained to prepare rehabilitation and structural improvement construction documents.

The project scope includes:

  • A thorough survey of the structural conditions, including a hands-on examination of all structural components.
  • Waterproofing investigation and design.
  • Laser scanning and BIM conversion.
  • New topping slab with hydronic snow melt system.
  • Concrete surface repairs and stair replacement.
  • Construction administration services during construction.